
© AGS Verfahrenstechnik
AGS Verfahrenstechnik from Stade:
The company has developed a cable laying technique for narrow routes up to two kilometers in length that reduces the amount of construction work required on the ground and enables simple cable replacement after laying. For this purpose, a cable transport pipe with an internal cable is guided through a water-filled empty conduit system without any tensile load.
