DualisFlexible production planning
The Advanced Planning and Scheduling (APS) system Ganttplan from Dualis IT Solution makes it possible to plan efficiently even in the event of unforeseen circumstances.

© EES
As simple as a light switch.
Remote control with the MFW.
- Data logger function
- IEC 60870-5-101/-104
- Future-proof LTE-4G connection
- Encrypted data communication
- Own infrastructure with radio or cable
- Optional CoDeSys Soft PLC
