3 of 6
Riffgat wind farm
© Siemens
The assembly ship can transport up to 24 rotor blades to the installation site. The Siemens rotor blades are manufactured from a single cast using the patented IntegralBlade process - i.e. without seams or glued joints.
3 of 6